# Risk register

> The organization's risks in a data grid with their residual band, status and next review date, the highest residual score first.

- Block: [risks](https://bettersupabase.com/blocks/risks.md)
- Kind: component
- Data: loaded on the server through the block's client
- Page: https://bettersupabase.com/recipes/risk-register

## Install the block

```bash
npx better-supabase add risks
```

## Web (Next.js)

Add the shadcn components:

```bash
npx shadcn add alert badge button empty skeleton @reui/data-grid @reui/frame
```

From `apps/examples/nextjs/src/features/risks/components/risk-register.tsx` (https://github.com/ScaleDockHQ/better-supabase/blob/main/apps/examples/nextjs/src/features/risks/components/risk-register.tsx):

```tsx
"use client";

import type { CellContext, ColumnDef } from "@tanstack/react-table";
import type { RiskStatus } from "better-supabase/blocks/risks";

import { useTable } from "@tanstack/react-table";
import { ShieldAlertIcon, TriangleAlertIcon } from "lucide-react";
import { useExtracted, useFormatter } from "next-intl";
import { useRouter } from "next/navigation";
import { useTransition } from "react";

import type { DataGridFeatures } from "@/components/reui/data-grid/data-grid";

import {
  Alert,
  AlertAction,
  AlertDescription,
  AlertTitle,
} from "@/components/reui/alert";
import { Badge } from "@/components/reui/badge";
import {
  DataGrid,
  DataGridContainer,
  dataGridFeatures,
} from "@/components/reui/data-grid/data-grid";
import { DataGridScrollArea } from "@/components/reui/data-grid/data-grid-scroll-area";
import { DataGridTable } from "@/components/reui/data-grid/data-grid-table";
import {
  Frame,
  FrameDescription,
  FrameHeader,
  FramePanel,
  FrameTitle,
} from "@/components/reui/frame";
import { Button } from "@/components/ui/button";
import {
  Empty,
  EmptyContent,
  EmptyDescription,
  EmptyHeader,
  EmptyMedia,
  EmptyTitle,
} from "@/components/ui/empty";
import { Skeleton } from "@/components/ui/skeleton";

import type { BandTone, Loaded, RiskRow } from "../risks-queries";

const TONE_VARIANT = {
  low: "success-light",
  medium: "warning-light",
  high: "destructive-light",
  critical: "destructive",
} as const satisfies Record<BandTone, string>;

type RiskCell = CellContext<DataGridFeatures, RiskRow>;

function NumberCell({ row }: RiskCell) {
  return (
    <span className="font-mono text-xs text-muted-foreground">
      {row.original.number}
    </span>
  );
}

function TitleCell({ row }: RiskCell) {
  return <span className="font-medium">{row.original.title}</span>;
}

function BandCell({ row }: RiskCell) {
  const t = useExtracted("risks");
  const { band, tone, score } = row.original;

  return band === null || tone === null ? (
    <span className="text-muted-foreground">{t("Not assessed")}</span>
  ) : (
    <Badge variant={TONE_VARIANT[tone]}>
      {t("{band} · {score, number}", { band, score: score ?? 0 })}
    </Badge>
  );
}

function StatusCell({ row }: RiskCell) {
  const t = useExtracted("risks");
  const status: RiskStatus = row.original.status;

  switch (status) {
    case "identified": {
      return <Badge variant="secondary">{t("Identified")}</Badge>;
    }

    case "assessed": {
      return <Badge variant="info-light">{t("Assessed")}</Badge>;
    }

    case "treating": {
      return <Badge variant="warning-light">{t("Treating")}</Badge>;
    }

    case "accepted": {
      return <Badge variant="success-light">{t("Accepted")}</Badge>;
    }

    case "closed": {
      return <Badge variant="secondary">{t("Closed")}</Badge>;
    }

    default: {
      const unknown: never = status;

      return unknown;
    }
  }
}

function ReviewCell({ row }: RiskCell) {
  const format = useFormatter();
  const { nextReviewOn } = row.original;

  return nextReviewOn === null ? (
    <span className="text-muted-foreground">–</span>
  ) : (
    <span className="tabular-nums">
      {format.dateTime(new Date(nextReviewOn), {
        dateStyle: "medium",
        timeZone: "UTC",
      })}
    </span>
  );
}

function RiskGrid({ risks }: { risks: readonly RiskRow[] }) {
  const t = useExtracted("risks");

  const columns: ColumnDef<DataGridFeatures, RiskRow>[] = [
    { accessorKey: "number", header: t("Number"), cell: NumberCell, size: 100 },
    { accessorKey: "title", header: t("Risk"), cell: TitleCell, size: 260 },
    { accessorKey: "category", header: t("Category"), size: 140 },
    { accessorKey: "band", header: t("Residual"), cell: BandCell, size: 150 },
    { accessorKey: "status", header: t("Status"), cell: StatusCell, size: 120 },
    {
      accessorKey: "nextReviewOn",
      header: t("Next review"),
      cell: ReviewCell,
      size: 140,
    },
  ];

  const table = useTable({
    features: dataGridFeatures,
    columns,
    data: [...risks],
    getRowId: (row) => row.id,
  });

  return (
    <DataGrid
      table={table}
      recordCount={risks.length}
      tableLayout={{ dense: true }}
    >
      <DataGridContainer>
        <DataGridScrollArea>
          <DataGridTable />
        </DataGridScrollArea>
      </DataGridContainer>
    </DataGrid>
  );
}

/**
 * The organization's risk register: each risk with its residual band and the
 * date of its next review, the highest residual score first.
 */
export function RiskRegister({ state }: { state: Loaded<readonly RiskRow[]> }) {
  const t = useExtracted("risks");
  const router = useRouter();
  const [retrying, startRetry] = useTransition();

  if (state.kind === "no-organization") {
    return null;
  }

  return (
    <Frame spacing="sm" data-recipe="risk-register">
      <FrameHeader className="gap-0.5">
        <FrameTitle>{t("Risk register")}</FrameTitle>
        <FrameDescription>
          {t(
            "Every identified risk with its residual rating after controls. A review moves the next review date ahead by the risk's interval.",
          )}
        </FrameDescription>
      </FrameHeader>
      <FramePanel>
        {state.kind === "error" ? (
          <Alert variant="destructive">
            <TriangleAlertIcon />
            <AlertTitle>{t("The risk register didn't load")}</AlertTitle>
            <AlertDescription>{t("Try again in a moment.")}</AlertDescription>
            <AlertAction>
              <Button
                size="sm"
                variant="outline"
                type="button"
                disabled={retrying}
                onClick={() => {
                  startRetry(() => {
                    router.refresh();
                  });
                }}
              >
                {t("Retry")}
              </Button>
            </AlertAction>
          </Alert>
        ) : state.data.length === 0 ? (
          <Empty>
            <EmptyHeader>
              <EmptyMedia variant="icon">
                <ShieldAlertIcon />
              </EmptyMedia>
              <EmptyTitle>{t("No risks yet")}</EmptyTitle>
              <EmptyDescription>
                {t(
                  "Register a risk with its cause and consequence, then assess it against the organization's matrix.",
                )}
              </EmptyDescription>
            </EmptyHeader>
            <EmptyContent>
              <a
                className="text-sm underline underline-offset-4"
                href="https://bettersupabase.com/docs/blocks/risks"
              >
                {t("Read the risks guide")}
              </a>
            </EmptyContent>
          </Empty>
        ) : (
          <RiskGrid risks={state.data} />
        )}
      </FramePanel>
    </Frame>
  );
}

export function RiskRegisterSkeleton() {
  return (
    <Frame spacing="sm" aria-busy="true">
      <FrameHeader className="gap-1">
        <Skeleton className="h-4 w-28" />
        <Skeleton className="h-4 w-80" />
      </FrameHeader>
      <FramePanel>
        <Skeleton className="h-48" />
      </FramePanel>
    </Frame>
  );
}
```

## Prompt

Paste this into a coding agent to build the recipe in your app.

### Web

```text
Build "Risk register" in a React web app that uses shadcn/ui components. The organization's risks in a data grid with their residual band, status and next review date, the highest residual score first.

It uses the better-supabase `risks` block (Risks). It loads its data on the server through the block's client.

Steps:

1. If the app doesn't have the block yet, add the SQL with `npx better-supabase add risks` and apply the migration.
2. Add the shadcn components the recipe uses: `npx shadcn add alert badge button empty skeleton @reui/data-grid @reui/frame`.
3. The recipe needs no glue: it calls the block's client on the server.
4. Write the component. Load the data on the server with the block's client, starting from the recipe's snippet (`apps/examples/nextjs/src/features/risks/components/risk-register.tsx`). Adapt it to the app's existing components, styling and data loading instead of copying it as is.
5. Check the result against the recipe and the block's docs: it typechecks, it reads the same block data, and it handles the loading and empty states the snippet handles.

Read the full code first:

- Recipe: https://bettersupabase.com/recipes/risk-register.md
- Block docs: https://bettersupabase.com/docs/blocks/risks
```
